Ravi Patel, Customer Admin

NP-200 system security design review

NimbusPump NP-200 Program · candidate AREV-0004 vs effective baseline DRB-0007

PRJ-2026-0042-DRV-0001Threat review

Completeness workspace

Analysis-readiness gates for the candidate; a blocked gate stops re-certification.

Analysis-readiness gate outcomes
SegmentCountShare
Passed675%
Waived113%
Blocked113%

1 gate blocked

6 OCR-proposed elements from SRC-0005 (pages 4-5) remain unconfirmed inside threat scopeResolve in mapping studio

  • PassedPriya Raman

    No included product/device root or review boundary

  • PassedPriya Raman

    Unresolved connectors or direction on a security/safety-relevant flow

  • PassedPriya Raman

    Network/external interface lacks trust zone or exposure classification

  • BlockedPriya Raman

    Unconfirmed image/PDF-derived element participates in threat scope

  • WaivedElena Vasquez

    Disconnected element is included but has no documented reason

  • PassedTomas Novak

    Operational update/recovery state missing for an updateable device

  • PassedDr. Lena Fischer

    Safety-relevant function lacks use case/data-flow context

  • PassedPriya Raman

    Source parser produced unresolved critical errors